BCR Port Subdivision Print E-mail

E
a
s
t
b
o
u
n  d
Mile PostStation  Method of ControlSiding length
W
e
s
t
b
o
u
n
d
Trackage Controlled by BCR Port Sub RTC
24.1Roberts Bank Rule 105 Territory 10,000' depart/receiving trks 
 17.4   
17.4GulfN / S depart / receiving trks CTC  
7.8Mudbay West 8100' 
7.7 North Colebrookconnection with BNSF  
6.9S Colebrookconnection with BNSF    
6.1Mudbay East 
4.0Detector 
0.0Prattsignalled siding /connection with SRY and beginning CPR Page sub7850' 
    
 CP Page Sub 
24.0PrattPratt to Livingston joint trk with SRY/CN/CP        
21.0 Langley 
18.9Milner 
16.4LivingstonConnection with SRY Fraser Valley Sub/CN Rawlison Sub 
   
  Rawllison Sub 
2.1Hopewellconnection with CP Page Sub 
1.6Rawlison 8115' 
 0.0        Hydro                   Jct with Yale Sub